Frequently Asked Solar Questions
FAQ’s answering questions related to solar panels, savings, and how solar works.
FAQs
Kindly check the EB Bill and typically to generate about 360 Units (kWh) per month a 3KWp system will be required.
Shadow free and flat terrace area of about 10 SqM per kWp is required.
Sending back the excess power generated to Grid by a captive solar plant.
- Existing meter will have to be replaced by a “Bi-Directional” meter.
- Customer will get a credit for units exported.
- Bill will be based on Net Energy Consumed.
As per Tamil Nadu Solar Energy Policy 2012,Net Meter available to below customers:
- LT Tariff IA : Domestic, Handloom, Nutrition Centres, etc.
- LT Tariff IC : L.T. Bulk supply, Railway Colonies, Defense colonies etc.
- LT Tariff IIA : Public lighting, water supply, Sewer, Village Panchayats /Town Panchayat & Municipality/ Corporations.
- LT Tariff IIB(1) : Govt and Aided Educational Institutions, Govt. Hospitals.LT Tariff V : Commercial.
- On Grid System – No, this system works in sync with Grid power and will turn off during grid outages.
- Off Grid System – Yes, this system works without Grid power and will continue to work during grid outages.
Non Penetrative type – Aluminium frames with self-ballasted concrete blocks to withstand heavy winds.
Monthly once and depending upon the dirt accumulation the cleaning schedule can be increased.
Monthly once and depending upon the dirt accumulation the cleaning schedule can be increased.